← Back to Projects

The Yuchengco Centre, EEI Corporation

Location: Manila

Year: 2024

The Yuchengco Centre, a landmark project by EEI Corporation in Manila, showcases innovative construction techniques using ABS Void Formworks by ABS Philippines. The image clearly depicts a vast expanse of Volimax void formworks strategically placed within steel reinforcement, ready for concrete pouring. This advanced voided slab technology is instrumental in achieving significantly lighter concrete slabs, a crucial benefit for high-rise developments and multi-story structures. By integrating ABS Void Formworks into the structural design, the Yuchengco Centre benefits from reduced concrete volume without compromising structural integrity. This leads to considerable material cost savings and a lower overall building weight, which can translate to smaller foundation requirements and enhanced seismic performance. The system facilitates faster construction cycles due to simplified formwork installation and less concrete to pour and cure, optimizing project timelines and reducing labor costs for this 2024 development. ABS Philippines' Volimax system, evident in this large-scale application, creates a bi-axial hollow slab, maximizing structural efficiency. This innovative approach to slab construction is a testament to sustainable engineering, minimizing environmental impact through reduced concrete consumption while delivering robust and efficient building solutions for modern commercial and institutional projects like The Yuchengco Centre.